A quick update here:
I had a Belkin Wemo wifi switch. Found this: http://wemo.forumatic.com/viewtopic.php?t=5&p=9
And wrapped that with a vbs script and now SGP can power off equipment
I do have a couple of questions though. Is it necessary/possible to disconnect equipment from SGP before powering them off? If so how do I do this automatically using sequence options?
Another question I have is on the warm up of cameras. Is it necessary to warm up (QSI683 & FLI ML Cameras) once sequence is done? I have just been powering them off, but not sure if a warm up is needed before power off to make sure camera electronics are safe etc.
If a warm up is needed, then not sure how to thread that in so that the power off script runs after warm up.
Thoughts?