Quantcast
Channel: Main Sequence Software - Latest posts
Viewing all articles
Browse latest Browse all 52138

Allow for both "cool down on camera connect" and "cool down on sequence start"

$
0
0

currently these two choices are mutually exclusive, but it's easy to get into a situation where the camera cooler is off when a sequence starts (like if you have "cool down on connect set, then ran a sequence which completed, which then shut the cooler off, but then rejiggered the sequence and started up again.)

i assume that making these two checkboxes non-exclusive would solve this problem, though maybe not (there seems to be a distinction between starting a sequence and resuming a sequence - i'd like SGP to check the cooler state and start the cooler if off in the resume and start cases.)

thanks

rob


Viewing all articles
Browse latest Browse all 52138

Trending Articles